Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the post-slider-and-carousel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114
RITES bags Rs 900-cr export order from Bangladesh Railways
    Rites bags Bangladesh order
    RITES bags order from Bangladesh Railways

    (20 second reading) RITES signed a contract agreement for supplying 200 passenger carriages to Bangladesh Railways.
    The export arm of Indian Railways said that the order is worth Rs 915 crore and is funded by European Investment Bank through a global competitive bidding process.
    The contract has a supply with a commissioning period of 36 months, followed by a warranty period of 24 months. This isn’t the first time that the company has contributed to Bangladesh’s infrastructure development. Previously, it had supplied 120 passenger coaches, 36 locomotives and 10 10-meter gauge locomotives to Bangladesh Railways.