Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the post-slider-and-carousel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/chanad5h/public_html/wp-includes/functions.php on line 6114
Waaree Energies secures 400 MW modules supply order
    waaree energies
    Waaree secures 400 MW modules supply order

    (20 second reading) Waaree Energies has secured an order from Gujarat Industries Power Company for the supply of 400 MW modules.
    The modules are on the Approved List of Models and Manufacturers (ALMM) and range between 540 Wp and 570 Wp (watt peak)
    The contract entails the comprehensive supply of solar PV modules incorporating advanced bifacial technology for the 2,375 MW RE (Renewable Energy) Park near village Khavda, Great Rann of Kutch, Gujarat.